Maple Plain Area Sewer Improvements

ES Project No. 802803

Text Alert Icons Project Alert

Project Update - Coming Soon.  See previous Project Updates below.

To receive project updates via email or text, sign up using the E-newsletter/SMS subscription form on the right.

 

Project Description

Metropolitan Council Environmental Services (ES), operator of the metro area wastewater collection and treatment system, is evaluating the rehabilitation or relocation of the aging and deteriorating sanitary sewer forcemain (pipe). The forcemain starts west of Town Line Road (Baker Park Road) and follows Highway 12 and Wayzata Boulevard to Willow Drive.

This infrastructure is a critical component of sanitary sewer service in Maple Plain, Independence, Medina, Orono, and Long Lake. The forcemain sends wastewater from local residents and businesses to the regional sewer that delivers it to the Blue Lake Water Resource Recovery Facility in Shakopee to be treated. Improvements to this system will repair or replace the aging infrastructure and enhance the system’s efficiency, reliability and capacity.
 

Project Map

Maple Plain sewer improvements site map. The lift station is located just west of Town Line Road (Baker Park Road). Improvements are proposed for two portions of the force main; along the southern side of Highway 12 from the lift station to just south of Lake Katrina and along Wayzata Boulevard from the Highway 12 intersection to Willow Drive.

Project Schedule

Design: 2025 through 2026
Construction: Spring 2028 through Fall 2029
Final Restoration: Spring 2030
 

Public Engagement

A virtual public meeting will be held during the design phase to share information about the proposed improvements, project schedule and how to stay informed. Regularly check the website or sign up for project updates for more information on this meeting as it becomes available.
 

Learn More

The sewer pipes right under our feet are an important part of our wastewater infrastructure, but they are getting old and need repair. ES has a strategic plan to fix aging sewer pipes to keep the region’s wastewater flowing and neighborhoods safe.
 

Project Updates

Coming soon

Project Staff

Project Manager: Amanda Mondor, Principal Engineer, Interceptor Engineering
 

Project Contacts

For assistance, call | Si necesita ayuda, llame al | Xav tau kev pab, hu | Wixii kaalmo ah, ka wac | Để được hỗ trợ, hãy gọi | လၢတၢ်ဃ့န့ၢ်တၢ်မၤစၢၤအဂီၢ, ကိးဘၣ်ဖဲ | 763-265-3304.

Email: [email protected]

Sign up for E-newsletter/SMS on the right side of the page.

Capital Improvement Program
Contact Us

    For assistance, call | Si necesita ayuda, llame al | Xav tau kev pab, hu | Wixii kaalmo ah, ka wac | Để được hỗ trợ, hãy gọi | လၢတၢ်ဃ့န့ၢ်တၢ်မၤစၢၤအဂီၢ, ကိးဘၣ်ဖဲ | 763-265-3304.

    Email: [email protected]