Fourth Incinerator Design Build Construction

The design build process starts with selecting the design builder and establishing cost based on the design build proposals. Preliminary drawings are started which then move into construction drawings. Different construction drawing packages can be completed at different times to allow for parts of the project (earthwork for example) to begin before other parts to expedite construction. This phase of the project ends with the fourth incinerator operational.

Schedules Timeline Construction 2021 to 2024
2025                                                         FORTH INCINERATOR CONSTRUCTION PROCESS                                                            2028

Select Design Builder/ Establish Cost

Preliminary
Drawings

Construction
Drawings

Fourth Incinerator
Construction

Fourth Incinerator
Operational

Construction workers at the Metro Plant
Construction Project Updates
Construction for the fourth incinerator is not planned to begin until 2024.