Project Overview

Metropolitan Council Environmental Services (MCES), in partnership with the City of Excelsior, is constructing a new regional gravity sewer pipe between sewer lift stations (pumping stations) L19 and L20. Work will also include decommissioning the old lift station L20 and its forcemain pipe, replacing Excelsior’s flow meter M417, improvements to City utilities and streets.

By eliminating a lift station, the project will reduce operating costs, improve energy efficiency, and make the regional sewer system more reliable. This helps MCES continue to protect public health, economic growth, and improve water quality while providing low-cost sewer service to serve the region. 

This map shows proposed sewer work within the City of Excelsior.  A new sewer pipe will be built between sewer pumping stations L19 (at Oak St and Beehrle Ave, where a new meter M417 will also be constructed) and L20 (at Galpin Lk Rd and Hwy 7). The map depicts that the L20 station and its forcemain pipe will be removed.  The existing sanitary sewer pipe includes segments along Oak St near the L19 station, and along County 7 running up to the west side of Mud Lake. The proposed work for the project runs along Oak St, William St, College Ave, Water St, Hwy 7, and just west of Mud Lake.

Project Description

The Metropolitan Council’s statutory mission is to foster efficient and economic growth for a prosperous region. Environmental Services supports that mission by providing regional wastewater service to 2.6 million people in 110 communities within the seven-county metropolitan area. The regional wastewater system protects public health and water quality while providing capacity to serve the planned growth of the region. The interceptor system meters and transports the wastewater flows from local community systems to one of nine regional wastewater treatment plants. It is comprised of over 610 miles of pipelines, 60 lift stations, and 223 metering sites.

The new regional sanitary pipe will start at L20 in Shorewood, go west following Highway 7 and crossing into the City of Excelsior at Water Street. Once in Excelsior, it will follow Water Street to College Avenue to William Street and turn north on Oak. It will follow Oak Street (County Road 19) to L19, near the intersection with Beehrle Avenue.

Construction impacts for this project may include dust, noise, odors, vibrations, traffic disruptions, equipment staging, and visual impacts. Construction is anticipated to start in early 2022 and be completed in the spring of 2024. However, construction will be sequenced so that work must be completed on one street before it moves to another. This stepwise approach helps avoid long term neighborhood disruption.


Excelsior L20 project map showing order of work in area north of Highway 7.  L19 lift station: October to December 2023.  Oak Street: spring to summer 2024.  William Street: Summer 2024.  College Avenue: Summer to fall 2024.  Grathwol Lane and Water Street: Summer 2024.  Water Street: Fall 2024.  Highway 7: fall to winter 2024.  L20 lift station and forcemain decommissioning: Fall to winter 2024.
 

July 20, 2022 Public Meeting

 

 

June 9, 2021 Virtual Public Meeting

 

 

 

Project Updates

Project Update - April 5, 2024 (PDF) 434 kB

Project Update - March 7, 2024 (PDF) 861 kB

Project Update - February 5, 2024 (PDF) 872 kB

Project Update Postcard - September 1, 2023 (PDF) 627 kB

Virtual Open House Presentation - June 9, 2021 (PDF) 5.7 MB

Project Staff

 

MCES: Dan Fick, Project Manager
City of Excelsior: Morgan Dawley, Excelsior City Engineer
 

Project Contacts

For information, please contact:

Email: [email protected]
Phone: 952-737-4681

Sign up for E-newsletter/SMS at the top right of the page.

Capital Improvement Program
Contact us
  • Contact project staff with questions or concerns about this construction project.

    Email: [email protected]

    Phone: 952-737-4681