District 15 Projects

Capital Program

District 15 In Dakota County this district includes the cities of Burnsville, Eagan, Inver Grove Heights, and Rosemount.

Lift Station Rehabilitation: Project 8055

Consists of improvements to Lift Stations L-13, L-30, L-34, L-56, L-66, and L-73. The project will replace obsolete, aging equipment and increase the lift stations' pumping capacity. A portion of the L-30 forcemain in Crystal (1-BC-453) will also be replaced under this project. Other Lift Stations to be rehabilitated include L-01, L-02, L-05, L-15, L-33, L-35, and L-57. In some cases, the lift station’s forcemain will be included in the rehabilitation.

Seneca Plant Solids Processing Improvements: Project 8075

The project consists of the renewal of the solids building facilities, which were originally constructed in 1972 and upgraded in 1995 and energy conservation elements. The project provides new wet scrubbers and caustic addition facilities to allow Seneca’s two multiple hearth incinerators to meet future EPA emissions limits. The project also includes energy conservation elements including replacement of thickening centrifuges with gravity belt thickeners, new aeration control valves and aeration blower (aeration efficiency improvements) and re-lighting of the tunnel system.

Seneca Interceptor System Rehabilitation: Project 8080

This project consists of the rehabilitation of portions of the interceptors that serve the Seneca WWTP. It includes Interceptors 7030, 7033, 3-BV-35 and 3-BV-39 in the City of Burnsville; Interceptors 7031, 7804, 3-BN-496, and 3-BN-499 in the City of Bloomington; and Interceptor 3-ET-37 in the City of Eagan. The project also includes improvements to the Seneca Interceptor System’s maintenance access structures (MAS).

St. Paul Interceptor System Rehabilitation: Project 8088

The interceptors located in Inver Grove Heights, Maplewood, Roseville, Shoreview, St. Paul, and Vadnais Heights are in need of rehabilitation and/or replacement. The project will rehabilitate existing interceptor facilities to ensure reliable service.

In addition to the major projects, there will be energy conservationinterceptor rehabilitation, lift stations, and meter improvement projects located in the district..

Lift Station Rehabilitation: Project 8055 224 kB

Seneca Plant Solids Processing: Project 8075 201 kB

Seneca Interceptor System Rehabilitation: Project 8080 274 kB

St. Paul Interceptor System Rehabilitation: Project 8088 205 kB