Posted In: Date: 4/28/2013 First LRV undergoing clearance verification today on Green Line The first light rail vehicle is making its inaugural appearance April 28 on the Green Line (Central Corridor LRT), albeit not under its own power. Read more
Posted In: Date: 2/20/2013 Washington Avenue Bridge retrofit for LRT line wins award for contractor Redesigning the iconic Washington Avenue Bridge over the Mississippi River in Minneapolis to carry light rail trains earned a coveted engineering award for the Metropolitan Council and AECOM. Read more
Posted In: Date: 12/21/2012 More than $1.2 billion in development occurring along Central Corridor The Green Line moniker is proving apt, with more than $1.2 billion in development occurring along the Central Corridor LRT line even before trains begin carrying passengers sometime in 2014. Read more
Posted In: Date: 12/12/2012 Busiest year of Central Corridor heavy construction coming to end Installing overhead wires, station art, testing trains on tap for 2013. Read more
Posted In: Date: 10/10/2012 First Central Corridor light rail vehicle, rebranded Hiawatha LRV meet the press Flashing the “Green Line” moniker, the first light rail vehicle (LRV) built for the Central Corridor LRT line arrived today at Target Field Station, its bell ringing with abandon. Read more